Cool cafeteria lights. |
The kitchen hood |
Kitchen fridge and freezer |
Everything is inspected. |
Grills and electric being installed in the cafeteria. |
Just a beehive of activity. Looks pretty solitary doesn't it? |
Hanging temporary lights. |
Look, bricks have arrived! |
One of three canopies on the back of the building that provide a rain overhang. |
The steel grid for artwork on the east wall. |
Electric conduit mostly runs in the walls. When a structural support is encountered, the conduit runs through the concrete. |
Speaking of electrical, don't try this at home. |
Only the best equipment is used. |
Need more proof? |
Mud and a traffic jam. |
Still working in the muck. |